CJV Group

M&E Design Consultancy – EDF, ABB & Balfour Kilpatrick


EHGE has gained a wealth of valuable experience over the fifteen year period it has worked closely with London Underground on the power delivery network. Understanding the particular challenges within this environment, our engineering design team was commissioned to provide design packages for the “Victoria Line Upgrade Project” for ventilation and air-conditioning requirements against London Underground head specifications, across seven sites

These sites have now been fully installed with state-of-the-art climate control solutions and are maintained by EHGE as incumbent contractor